Minimal | |
| Light | ||
| Moderate | ||
| Heavy | ||
| Severe |
| Gen Station 18 June 13 |
Energy (Megawatts) |
| Hwange | 578 MW |
| Kariba | 750 MW |
| Harare | 15 MW |
| Munyati | 35 MW |
| Bulawayo | 23 MW |
| Imports | 180 MW |
| Total | 1581 MW |
17 JUNE 2013
+100 customers affected in Avonlea
Fault occurred on 12 June 2013
Substation completely burnt (s/s1864). Substation to be reconstructed
Estimated Restoration Time: 21/06/13 1630hrs
** Please note that most of the affected customers on back feed except a few
Action: Network Manager North
Nature of fault: Cable Fault between S/S 1341 & S/S 1594
Fault occurred on 13/06/13
Number of customers affected: Customers on backfeed
Estimated Restoration Time: 17/06/13 1600hrs
Action: Network Manager South
3. S/S 2090 Ardbennie
Nature of fault: 200kVA Tx
Fault occurred on 14/06/13
Number of customers affected: 100
Estimated Restoration Time: 17/06/13 1600hrs
Action: Network Manager South
4. CB 19 Willowvale
Nature of fault: Low voltage
Fault occurred on 17/06/13
Number of customers affected: 500
Estimated Restoration Time: 17/06/13 1600hrs
Action: Network Manager South
5. CB 139 Willowvale
Nature of fault: Still sectionalising
Fault occurred on 16/06/13
Number of customers affected: 500
Estimated Restoration Time: 17/06/13 1600hrs
Action: Network Manager South
6. M70 T3
Nature of fault: 2 CTs leaking
Fault occurred on 16/06/13
Number of customers affected: +/-4000
Estimated Restoration Time: 17/06/13 1630hrs
Action: Network Manager Chitungwiza
17 June 2013
1. G 23 S 2 – Thornhill Feeder, Gweru
Nature of Fault: Line Fault, Substation Transformer fault (Oil drained)
Fault occurred: 17/06/13
Number of customers affected: 800
Expected date of restoration: 17/06/2013 1630hrs
Action: Network Manager (Gweru)
2. S 20 S 103 – Mabika Feeder, Zvishavane
Nature of Fault: Line Fault, Fault to be located
Fault occurred: 17/06/13
Number of customers affected: 100
Expected date of restoration: 17/06/2013 1630hrs
Action: Network Manager (Gweru)
DAILY FAULT REPORT
Northern Region
Monday 17 June 2013
C/B tripped
Fault occurred on 14/06/13 at 08:40 hrs
Estimated Restoration Time: 10:10 hrs
20 Customers affected
C/B tripped
Fault occurred on 14/06/13 at 08:41 hrs
Estimated Restoration Time: 15:00 hrs
40 Customer affected
Burnt LV feeder cable
Fault occurred on 14/06/13 at 09:02 hrs
Estimated Restoration Time: Pending
1 Customer affected
Power going on and off
Fault occurred on 14/06/13 at 11:23 hrs
Estimated Restoration Time: Pending
2000 Customers affected
A/R tripped
Fault occurred on 14/06/13 at 14:14 hrs
Estimated Restoration Time: 19:30 hrs
40 Customers affected
C/B tripped
Fault occurred on 14/06/13 at 16:00 hrs
Estimated Restoration Time: 16:25 hrs
20 Customers affected
Tree branch fell on LT line
Fault occurred on 14/06/13 at 17:32 hrs
Estimated Restoration Time: 18:30 hrs
8 Chinhoyi 2 Feeder SS 129 (Mhangura)
30 Customers affected
C/B tripped
Fault occurred on 14/06/13 at 17:51 hrs
Estimated Restoration Time: 19:00 hrs
9 Chinhoyi 2 Feeder SS 97 (Karoi)
20 Customers affected
C/B tripped
Fault occurred on 14/06/13 at 18:14 hrs
Estimated Restoration Time: 11:00 hrs on 15/06/13
10 11kV Two Tree Feeder M94c (Mhangura)
+-75 Customers affected
A/R tripped
Fault occurred on 14/06/13 at 14:05 hrs
Estimated Restoration Time: 18:30 hrs
11 K2g Feeder (Karoi)
+-150 Customers affected
Low voltage
Fault occurred on 14/06/13 at 03:00 hrs
Estimated Restoration Time: 19:00 hrs
12 K2aFeeder SS 8 (Kariba)
+-50 Customers affected
Blown fuse
Fault occurred on 14/06/13 at 17:00 hrs
Estimated Restoration Time: 20:30 hrs
1 Customer affected
Sparks on weather-dac
Fault occurred on 15/06/13 at 09:47 hrs
Estimated Restoration Time: Pending
3000 Customers affected
A/R tripped
Fault occurred on 15/06/13 at 18:03 hrs
Estimated Restoration Time: 18:30 hrs
30 Customers affected
C/B tripped
Fault occurred on 15/06/13 at 18:25 hrs
Estimated Restoration Time: 20:30 hrs
16 K6a Feeder (Karoi)
+-350 Customers affected
Unknown
Fault occurred on 15/06/13 at 13:30 hrs
Estimated Restoration Time: 16:35 hrs
17 K4b Feeder (Karoi)
+-180 Customers affected
Unknown
Fault occurred on 15/06/13 at 16:10 hrs
Estimated Restoration Time: 20:13 hrs
18 K6a Feeder SS 8 (Karoi)
+-100 Customer affected
Unknown
Fault occurred on 15/06/13 at 07:30 hrs
Estimated Restoration Time: 14:55 hrs
40 Customers affected
C/B tripped
Fault occurred on 16/06/13 at 11:25 hrs
Estimated Restoration Time: 12:30 hrs
2 Customers affected
No power
Fault occurred on 16/06/13 at 11:26 hrs
Estimated Restoration Time: 16:30 hrs fault on customers side
100 Customers affected
A/R tripped
Fault occurred on 16/06/13 at 11:53 hrs
Estimated Restoration Time: 15:30 hrs
1000 Customers affected
No power
Fault occurred on 16/06/13 at 13:00 hrs
Estimated Restoration Time: Pending
3000 Customers affected
A/R tripped
Fault occurred on 16/06/13 at 17:37 hrs
Estimated Restoration Time: 18:03 hrs
2000 Customers affected
A/R tripped
Fault occurred on 16/06/13 at 18:17 hrs
Estimated Restoration Time: 19:03 hrs
30 Customers affected
C/B tripped
Fault occurred on 16/06/13 at 18:36 hrs
Estimated Restoration Time: 19:00 hrs
75 Customers affected
Burnt D-mounts
Fault occurred on 16/06/13 at 05:27 hrs
Estimated Restoration Time: 12:54 hrs
+-70 Customers affected
Open link
Fault occurred on 16/06/13 at 07:04 hrs
Estimated Restoration Time: 16:32 hrs
10 Mutorashanga 11kV Feeder (Mutorashanga)
10 Customers affected
Power going on and off
Fault occurred on 16/06/13 at 09:30 hrs
Estimated Restoration Time: Pending
11 Birkdale Feeder (Mutorashanga)
2000 Customers affected
C/B tripped
Fault occurred on 16/06/13 at 13:05 hrs
Estimated Restoration Time: 13:25 hrs
12 Barwick Feeder (Mutorashanga)
1 Customer affected
Single phasing at Jongwe Store
Fault occurred on 16/06/13 at 13:35 hrs
Estimated Restoration Time: Pending
13 M68b Feeder (Karoi)
+-60 Customers affected
Broken jumper
Fault occurred on 16/06/13 at 20:00 hrs
Estimated Restoration Time: 22:14 hrs
14 K2g Feeder (Karoi)
+-150 Customers affected
Low voltage
Fault occurred on 16/06/13 at 04:00 hrs
Estimated Restoration Time: 09:40 hrs
15 K2aFeeder (Mutorashanga)
+-30 Customer affected
Branch on line
Fault occurred on 16/06/13 at 11:00 hrs
Estimated Restoration Time: 16:00 hrs
16 Francis 11kv feeder (Norton)
1 Customer affected
Single phasing
Fault occurred on 14/06/13 at 14:48hrs
Estimated Restoration Time: 17.06.13
17 Clearwater 11kv feeder (Norton)
50Customer affected
No power
Fault occurred on 16/06/13 at 13:10hrs
Estimated Restoration Time: 17.06.13
18 Majestic 11kv feeder (Norton)
2 Customer affected
Dropped link
Fault occurred on 14/06/13 at 07:54hrs
Estimated Restoration Time: 13:40hrs – 15.06.13
19 Town 2 LT (Chegutu)
1 Customer affected
Burnt weatherdac – C372
Fault occurred on 14/06/13 at 11:20hrs
Estimated Restoration Time: 18.06.13
20 Town 2 LT (Chegutu)
1 Customer affected
No power – P827
Fault occurred on 14/06/13 at 15:28hrs
Estimated Restoration Time: 18.06.13
21 Railway 11kv feeder (Chegutu)
20 Customer affected
Tripped AR
Fault occurred on 15/06/13 at 07:43hrs
Estimated Restoration Time: 16:00hrs
22 Majestic 11kv feeder (Chegutu)
600 Customer affected
Broken conductor
Fault occurred on 15/06/13 at 09:27hrs
Estimated Restoration Time: 17.40hrs
23 Water LT (Chegutu)
1 Customer affected
Tripped MCB -50026
Fault occurred on 15/06/13 at 10:00hrs
Estimated Restoration Time: 18.06.13
24 Kasama 11kv feeder (Chegutu)
1 Customer affected
Touching conductors
Fault occurred on 15/06/13 at 19:42hrs
Estimated Restoration Time: 17.06.13
25 Railway 11kv feeder (Chegutu)
60 Customer affected
No power
Fault occurred on 15/06/13 at 08:37hrs
Estimated Restoration Time: 17.06.13
26 Gadzema 11kv feeder (Chegutu)
4000 Customer affected
Tripped CB
Fault occurred on 16/06/13 at
Estimated Restoration Time: 12:57hrs
27 Gadzema 33kv feeder (Chegutu)
4000 Customer affected
Tripped CB
Fault occurred on 16/06/13 at
Estimated Restoration Time: 12:57hrs
28 Chegutu East 33kv feeder (Chegutu)
600 Customer affected
Questionare
Do you have energy saver bulbs in your house?

The Ministry of Energy and Power Development has successfully launched the prepaid metering technology that is replacing the conventional billing system that had been posing challenges to the Zimbabwe Electricity Transmission and Distribution Company (ZETDC), a subsidiary of ZESA Holdings. ZETDC has already installed 19 000 prepaid meters countrywide, with a further 19 000 expected to be installed by end...
Read more
Since 2007, the country experienced load shedding as a result of the shortage of capacity in the country. What exactly is load shedding? Load shedding simply stated is a controlled temporary way of cutting power to parts of the country when there is not enough electricity to meet the needs of customers. This is as a result of a shortage of...
Read more
The idea and principle behind the conserving of energy is that it is better to INFORM the public about the state of the network and ASK them to do something to help, than it is for everyone to experience rolling load shedding of long periods. When you stop to think about it, it is logical that power usage peaks between 5...
Read more
If you are wondering if you really make an impact - consider this. Nothing connects all of us together like the electricity network. Electricity cannot be effectively stored in large quantities. This means that when you turn on a light, that power needs to be generated immediately by a generator somewhere on the network. If there is not enough generation available,...
Read more
When originally installed a wiring system is suitably designed for its intended purpose and each circuit is safeguarded against the effects of overload, short-circuits and fault currents by protective devices of the correct current rating and breaking capacity. In this regard, the wiring regulations are explicit that every circuit shall be so designed that a small overload of long duration...
Read more
|
Click here |
|
US14c kWh |
|
US9.83c kWh |
+263 4 773302/04-10,
+263 4 773314/16/18/19/24/28-31/34,
+263 4 774491/96/98-9
Fax:+263 4 774542/3
Email:
This email address is being protected from spambots. You need JavaScript enabled to view it.
Address: Electricity Centre
25 Samora Machel Ave
Harare
| |
Minimal | |
| Light | ||
| Moderate | ||
| Heavy | ||
| Severe |
| Gen Station 18 June 13 |
Energy (Megawatts) |
| Hwange | 578 MW |
| Kariba | 750 MW |
| Harare | 15 MW |
| Munyati | 35 MW |
| Bulawayo | 23 MW |
| Imports | 180 MW |
| Total | 1581 MW |
17 JUNE 2013
+100 customers affected in Avonlea
Fault occurred on 12 June 2013
Substation completely burnt (s/s1864). Substation to be reconstructed
Estimated Restoration Time: 21/06/13 1630hrs
** Please note that most of the affected customers on back feed except a few
Action: Network Manager North
Nature of fault: Cable Fault between S/S 1341 & S/S 1594
Fault occurred on 13/06/13
Number of customers affected: Customers on backfeed
Estimated Restoration Time: 17/06/13 1600hrs
Action: Network Manager South
3. S/S 2090 Ardbennie
Nature of fault: 200kVA Tx
Fault occurred on 14/06/13
Number of customers affected: 100
Estimated Restoration Time: 17/06/13 1600hrs
Action: Network Manager South
4. CB 19 Willowvale
Nature of fault: Low voltage
Fault occurred on 17/06/13
Number of customers affected: 500
Estimated Restoration Time: 17/06/13 1600hrs
Action: Network Manager South
5. CB 139 Willowvale
Nature of fault: Still sectionalising
Fault occurred on 16/06/13
Number of customers affected: 500
Estimated Restoration Time: 17/06/13 1600hrs
Action: Network Manager South
6. M70 T3
Nature of fault: 2 CTs leaking
Fault occurred on 16/06/13
Number of customers affected: +/-4000
Estimated Restoration Time: 17/06/13 1630hrs
Action: Network Manager Chitungwiza
17 June 2013
1. G 23 S 2 – Thornhill Feeder, Gweru
Nature of Fault: Line Fault, Substation Transformer fault (Oil drained)
Fault occurred: 17/06/13
Number of customers affected: 800
Expected date of restoration: 17/06/2013 1630hrs
Action: Network Manager (Gweru)
2. S 20 S 103 – Mabika Feeder, Zvishavane
Nature of Fault: Line Fault, Fault to be located
Fault occurred: 17/06/13
Number of customers affected: 100
Expected date of restoration: 17/06/2013 1630hrs
Action: Network Manager (Gweru)
DAILY FAULT REPORT
Northern Region
Monday 17 June 2013
C/B tripped
Fault occurred on 14/06/13 at 08:40 hrs
Estimated Restoration Time: 10:10 hrs
20 Customers affected
C/B tripped
Fault occurred on 14/06/13 at 08:41 hrs
Estimated Restoration Time: 15:00 hrs
40 Customer affected
Burnt LV feeder cable
Fault occurred on 14/06/13 at 09:02 hrs
Estimated Restoration Time: Pending
1 Customer affected
Power going on and off
Fault occurred on 14/06/13 at 11:23 hrs
Estimated Restoration Time: Pending
2000 Customers affected
A/R tripped
Fault occurred on 14/06/13 at 14:14 hrs
Estimated Restoration Time: 19:30 hrs
40 Customers affected
C/B tripped
Fault occurred on 14/06/13 at 16:00 hrs
Estimated Restoration Time: 16:25 hrs
20 Customers affected
Tree branch fell on LT line
Fault occurred on 14/06/13 at 17:32 hrs
Estimated Restoration Time: 18:30 hrs
8 Chinhoyi 2 Feeder SS 129 (Mhangura)
30 Customers affected
C/B tripped
Fault occurred on 14/06/13 at 17:51 hrs
Estimated Restoration Time: 19:00 hrs
9 Chinhoyi 2 Feeder SS 97 (Karoi)
20 Customers affected
C/B tripped
Fault occurred on 14/06/13 at 18:14 hrs
Estimated Restoration Time: 11:00 hrs on 15/06/13
10 11kV Two Tree Feeder M94c (Mhangura)
+-75 Customers affected
A/R tripped
Fault occurred on 14/06/13 at 14:05 hrs
Estimated Restoration Time: 18:30 hrs
11 K2g Feeder (Karoi)
+-150 Customers affected
Low voltage
Fault occurred on 14/06/13 at 03:00 hrs
Estimated Restoration Time: 19:00 hrs
12 K2aFeeder SS 8 (Kariba)
+-50 Customers affected
Blown fuse
Fault occurred on 14/06/13 at 17:00 hrs
Estimated Restoration Time: 20:30 hrs
1 Customer affected
Sparks on weather-dac
Fault occurred on 15/06/13 at 09:47 hrs
Estimated Restoration Time: Pending
3000 Customers affected
A/R tripped
Fault occurred on 15/06/13 at 18:03 hrs
Estimated Restoration Time: 18:30 hrs
30 Customers affected
C/B tripped
Fault occurred on 15/06/13 at 18:25 hrs
Estimated Restoration Time: 20:30 hrs
16 K6a Feeder (Karoi)
+-350 Customers affected
Unknown
Fault occurred on 15/06/13 at 13:30 hrs
Estimated Restoration Time: 16:35 hrs
17 K4b Feeder (Karoi)
+-180 Customers affected
Unknown
Fault occurred on 15/06/13 at 16:10 hrs
Estimated Restoration Time: 20:13 hrs
18 K6a Feeder SS 8 (Karoi)
+-100 Customer affected
Unknown
Fault occurred on 15/06/13 at 07:30 hrs
Estimated Restoration Time: 14:55 hrs
40 Customers affected
C/B tripped
Fault occurred on 16/06/13 at 11:25 hrs
Estimated Restoration Time: 12:30 hrs
2 Customers affected
No power
Fault occurred on 16/06/13 at 11:26 hrs
Estimated Restoration Time: 16:30 hrs fault on customers side
100 Customers affected
A/R tripped
Fault occurred on 16/06/13 at 11:53 hrs
Estimated Restoration Time: 15:30 hrs
1000 Customers affected
No power
Fault occurred on 16/06/13 at 13:00 hrs
Estimated Restoration Time: Pending
3000 Customers affected
A/R tripped
Fault occurred on 16/06/13 at 17:37 hrs
Estimated Restoration Time: 18:03 hrs
2000 Customers affected
A/R tripped
Fault occurred on 16/06/13 at 18:17 hrs
Estimated Restoration Time: 19:03 hrs
30 Customers affected
C/B tripped
Fault occurred on 16/06/13 at 18:36 hrs
Estimated Restoration Time: 19:00 hrs
75 Customers affected
Burnt D-mounts
Fault occurred on 16/06/13 at 05:27 hrs
Estimated Restoration Time: 12:54 hrs
+-70 Customers affected
Open link
Fault occurred on 16/06/13 at 07:04 hrs
Estimated Restoration Time: 16:32 hrs
10 Mutorashanga 11kV Feeder (Mutorashanga)
10 Customers affected
Power going on and off
Fault occurred on 16/06/13 at 09:30 hrs
Estimated Restoration Time: Pending
11 Birkdale Feeder (Mutorashanga)
2000 Customers affected
C/B tripped
Fault occurred on 16/06/13 at 13:05 hrs
Estimated Restoration Time: 13:25 hrs
12 Barwick Feeder (Mutorashanga)
1 Customer affected
Single phasing at Jongwe Store
Fault occurred on 16/06/13 at 13:35 hrs
Estimated Restoration Time: Pending
13 M68b Feeder (Karoi)
+-60 Customers affected
Broken jumper
Fault occurred on 16/06/13 at 20:00 hrs
Estimated Restoration Time: 22:14 hrs
14 K2g Feeder (Karoi)
+-150 Customers affected
Low voltage
Fault occurred on 16/06/13 at 04:00 hrs
Estimated Restoration Time: 09:40 hrs
15 K2aFeeder (Mutorashanga)
+-30 Customer affected
Branch on line
Fault occurred on 16/06/13 at 11:00 hrs
Estimated Restoration Time: 16:00 hrs
16 Francis 11kv feeder (Norton)
1 Customer affected
Single phasing
Fault occurred on 14/06/13 at 14:48hrs
Estimated Restoration Time: 17.06.13
17 Clearwater 11kv feeder (Norton)
50Customer affected
No power
Fault occurred on 16/06/13 at 13:10hrs
Estimated Restoration Time: 17.06.13
18 Majestic 11kv feeder (Norton)
2 Customer affected
Dropped link
Fault occurred on 14/06/13 at 07:54hrs
Estimated Restoration Time: 13:40hrs – 15.06.13
19 Town 2 LT (Chegutu)
1 Customer affected
Burnt weatherdac – C372
Fault occurred on 14/06/13 at 11:20hrs
Estimated Restoration Time: 18.06.13
20 Town 2 LT (Chegutu)
1 Customer affected
No power – P827
Fault occurred on 14/06/13 at 15:28hrs
Estimated Restoration Time: 18.06.13
21 Railway 11kv feeder (Chegutu)
20 Customer affected
Tripped AR
Fault occurred on 15/06/13 at 07:43hrs
Estimated Restoration Time: 16:00hrs
22 Majestic 11kv feeder (Chegutu)
600 Customer affected
Broken conductor
Fault occurred on 15/06/13 at 09:27hrs
Estimated Restoration Time: 17.40hrs
23 Water LT (Chegutu)
1 Customer affected
Tripped MCB -50026
Fault occurred on 15/06/13 at 10:00hrs
Estimated Restoration Time: 18.06.13
24 Kasama 11kv feeder (Chegutu)
1 Customer affected
Touching conductors
Fault occurred on 15/06/13 at 19:42hrs
Estimated Restoration Time: 17.06.13
25 Railway 11kv feeder (Chegutu)
60 Customer affected
No power
Fault occurred on 15/06/13 at 08:37hrs
Estimated Restoration Time: 17.06.13
26 Gadzema 11kv feeder (Chegutu)
4000 Customer affected
Tripped CB
Fault occurred on 16/06/13 at
Estimated Restoration Time: 12:57hrs
27 Gadzema 33kv feeder (Chegutu)
4000 Customer affected
Tripped CB
Fault occurred on 16/06/13 at
Estimated Restoration Time: 12:57hrs
28 Chegutu East 33kv feeder (Chegutu)
600 Customer affected