http://www.zesa.co.zw/htdocs/modules/mod_image_show_gk4/cache/419829py1gk-is-118.jpglink
http://www.zesa.co.zw/htdocs/modules/mod_image_show_gk4/cache/528361karibagk-is-118.jpglink
http://www.zesa.co.zw/htdocs/modules/mod_image_show_gk4/cache/421923Power_Generation_Industry_html_m12a7f8aagk-is-118.jpglink
0 1 2
Progress bar

Load Shedding Status

    Minimal
    Light
    Moderate
    Heavy
    Severe

Power Generation Stats

Gen Station
18 June 13
Energy
(Megawatts)
Hwange 578 MW
Kariba 750 MW
Harare   15 MW
Munyati   35 MW
Bulawayo    23 MW
Imports   180 MW
Total 1581 MW

Major Faults or Maintanance

 

ZIMBABWE ELECTRICITY TRANSMISSION AND DISTRIBUTION COMPANY (ZETDC) PVT LTD

 

DAILY FAULT REPORT

 

 

 

17 JUNE 2013

 

Harare Region

 

  1. 1.Mabelreign –CB 29 Birches (s/s 1864 - Avonlea Drive)

 

+100 customers affected in Avonlea

 

            Fault occurred on 12 June 2013

 

            Substation completely burnt (s/s1864). Substation to be reconstructed

 

            Estimated Restoration Time: 21/06/13 1630hrs

 

** Please note that most of the affected customers on back feed except a few

 

Action:                        Network Manager North

 

  1. 2.CB 119 Willowvale

 

            Nature of fault: Cable Fault between S/S 1341 & S/S 1594

 

            Fault occurred on 13/06/13

 

            Number of customers affected: Customers on backfeed

 

            Estimated Restoration Time: 17/06/13 1600hrs

 

Action:                 Network Manager South

 

 

 

3.         S/S 2090 Ardbennie

 

            Nature of fault: 200kVA Tx

 

            Fault occurred on 14/06/13

 

            Number of customers affected: 100

 

            Estimated Restoration Time: 17/06/13 1600hrs

 

Action:                 Network Manager South

 

 

 

4.         CB 19 Willowvale

 

            Nature of fault: Low voltage

 

            Fault occurred on 17/06/13

 

            Number of customers affected: 500

 

            Estimated Restoration Time: 17/06/13 1600hrs

 

Action:                 Network Manager South

 

 

 

5.         CB 139 Willowvale

 

            Nature of fault: Still sectionalising

 

            Fault occurred on 16/06/13

 

            Number of customers affected: 500

 

            Estimated Restoration Time: 17/06/13 1600hrs

 

Action:                 Network Manager South

 

 

 

6.         M70 T3

 

Nature of fault: 2 CTs leaking

 

Fault occurred on 16/06/13

 

Number of customers affected: +/-4000

 

Estimated Restoration Time: 17/06/13 1630hrs

 

            Action:                 Network Manager Chitungwiza

 

ZIMBABWE ELECTRICITY TRANSMISSION AND DISTRIBUTION COMPANY (ZETDC) PVT LTD

 

DAILY FAULT REPORT

 

 

 

17 June 2013

 

 

 

 

 

 

 

Southern Region

 

 

 

 

 

1.         G 23 S 2 – Thornhill Feeder, Gweru  

 

Nature of Fault: Line Fault, Substation Transformer fault (Oil drained)

 

Fault occurred: 17/06/13

 

Number of customers affected: 800

 

Expected date of restoration: 17/06/2013 1630hrs

 

Action:                        Network Manager (Gweru)

 

2.         S 20 S 103 – Mabika Feeder, Zvishavane  

 

Nature of Fault: Line Fault, Fault to be located

 

Fault occurred: 17/06/13

 

Number of customers affected: 100

 

Expected date of restoration: 17/06/2013 1630hrs

 

Action:                        Network Manager (Gweru)

 

DAILY FAULT REPORT

Northern Region

Monday 17 June 2013

  1. 1Chinhoyi North 33kV Feeder (Chinhoyi)
  2. 000 Customer affected

C/B tripped

Fault occurred on 14/06/13 at 08:40 hrs

Estimated Restoration Time: 10:10 hrs

 

  1. 2Chinhoyi 2 Feeder SS 35 (Chinhoyi)

20 Customers affected

C/B tripped

Fault occurred on 14/06/13 at 08:41 hrs

Estimated Restoration Time: 15:00 hrs

 

  1. 3Lions Den Feeder SS 137 (Chinhoyi)

40 Customer affected

Burnt LV feeder cable

Fault occurred on 14/06/13 at 09:02 hrs

Estimated Restoration Time: Pending

 

  1. 4Lions Den Feeder SS(Chinhoyi)

1 Customer affected

Power going on and off

Fault occurred on 14/06/13 at 11:23 hrs

Estimated Restoration Time: Pending

 

 

 

 

 

  1. 5Lions Den Feeder M10S177 (Chinhoyi)

2000 Customers affected

A/R tripped

Fault occurred on 14/06/13 at 14:14 hrs

Estimated Restoration Time: 19:30 hrs

 

  1. 6Chinhoyi 2 Feeder SS 37 (Chinhoyi)

40 Customers affected

C/B tripped

Fault occurred on 14/06/13 at 16:00 hrs

Estimated Restoration Time: 16:25 hrs

 

  1. 7Chinhoyi 2 Feeder SS 108(Chinhoyi)

20 Customers affected

Tree branch fell on LT line

Fault occurred on 14/06/13 at 17:32 hrs

Estimated Restoration Time: 18:30 hrs

8                Chinhoyi 2 Feeder SS 129 (Mhangura)

30 Customers affected

C/B tripped

Fault occurred on 14/06/13 at 17:51 hrs

Estimated Restoration Time: 19:00 hrs

9       Chinhoyi 2 Feeder SS 97 (Karoi)

20 Customers affected

C/B tripped

Fault occurred on 14/06/13 at 18:14 hrs

Estimated Restoration Time: 11:00 hrs on 15/06/13

10     11kV Two Tree Feeder M94c (Mhangura)

+-75 Customers affected

A/R tripped

Fault occurred on 14/06/13 at 14:05 hrs

Estimated Restoration Time: 18:30 hrs

11     K2g Feeder (Karoi)

+-150 Customers affected

Low voltage

Fault occurred on 14/06/13 at 03:00 hrs

Estimated Restoration Time: 19:00 hrs

 

12          K2aFeeder SS 8 (Kariba)

         +-50 Customers affected

Blown fuse

Fault occurred on 14/06/13 at 17:00 hrs

Estimated Restoration Time: 20:30 hrs

 

  1. 13der SS 28 (Chinhoyi)

1 Customer affected

Sparks on weather-dac

Fault occurred on 15/06/13 at 09:47 hrs

Estimated Restoration Time: Pending

 

  1. 14der M133S152 (Chinhoyi)

3000 Customers affected

A/R tripped

Fault occurred on 15/06/13 at 18:03 hrs

Estimated Restoration Time: 18:30 hrs

 

  1. 15

30 Customers affected

C/B tripped

Fault occurred on 15/06/13 at 18:25 hrs

Estimated Restoration Time: 20:30 hrs

16         K6a Feeder (Karoi)

+-350 Customers affected

Unknown

Fault occurred on 15/06/13 at 13:30 hrs

Estimated Restoration Time: 16:35 hrs

   17      K4b Feeder (Karoi)

+-180 Customers affected

Unknown

Fault occurred on 15/06/13 at 16:10 hrs

Estimated Restoration Time: 20:13 hrs

18     K6a Feeder SS 8 (Karoi)

         +-100 Customer affected

Unknown

Fault occurred on 15/06/13 at 07:30 hrs

Estimated Restoration Time: 14:55 hrs

 

  1. 19der SS 109 (Chinhoyi)

40 Customers affected

C/B tripped

Fault occurred on 16/06/13 at 11:25 hrs

Estimated Restoration Time: 12:30 hrs

 

  1. 20der SS 12 (Chinhoyi)

2 Customers affected

No power

Fault occurred on 16/06/13 at 11:26 hrs

Estimated Restoration Time: 16:30 hrs fault on customers side

 

  1. 21

100 Customers affected

A/R tripped

Fault occurred on 16/06/13 at 11:53 hrs

Estimated Restoration Time: 15:30 hrs

 

  1. 22

1000 Customers affected

No power

Fault occurred on 16/06/13 at 13:00 hrs

Estimated Restoration Time: Pending

 

  1. 23der M133S152 (Chinhoyi)

3000 Customers affected

A/R tripped

Fault occurred on 16/06/13 at 17:37 hrs

Estimated Restoration Time: 18:03 hrs

 

  1. 24der M12S139 (Chinhoyi)

2000 Customers affected

A/R tripped

Fault occurred on 16/06/13 at 18:17 hrs

Estimated Restoration Time: 19:03 hrs

 

  1. 25der SS 101 (Chinhoyi)

30 Customers affected

C/B tripped

Fault occurred on 16/06/13 at 18:36 hrs

Estimated Restoration Time: 19:00 hrs

 

 

  1. 26der M94c (Mhangura)

75 Customers affected

Burnt D-mounts

Fault occurred on 16/06/13 at 05:27 hrs

Estimated Restoration Time: 12:54 hrs

 

  1. 27der M94b (Mhangura)

+-70 Customers affected

Open link

Fault occurred on 16/06/13 at 07:04 hrs

Estimated Restoration Time: 16:32 hrs

10          Mutorashanga 11kV Feeder (Mutorashanga)

10 Customers affected

Power going on and off

Fault occurred on 16/06/13 at 09:30 hrs

Estimated Restoration Time: Pending

11            Birkdale Feeder (Mutorashanga)

2000 Customers affected

C/B tripped

Fault occurred on 16/06/13 at 13:05 hrs

Estimated Restoration Time: 13:25 hrs

12            Barwick Feeder (Mutorashanga)

         1 Customer affected

Single phasing at Jongwe Store

Fault occurred on 16/06/13 at 13:35 hrs

Estimated Restoration Time: Pending

13            M68b Feeder (Karoi)

+-60 Customers affected

Broken jumper

Fault occurred on 16/06/13 at 20:00 hrs

Estimated Restoration Time: 22:14 hrs

14          K2g Feeder (Karoi)

+-150 Customers affected

Low voltage

Fault occurred on 16/06/13 at 04:00 hrs

Estimated Restoration Time: 09:40 hrs

 

15          K2aFeeder (Mutorashanga)

         +-30 Customer affected

Branch on line

Fault occurred on 16/06/13 at 11:00 hrs

Estimated Restoration Time: 16:00 hrs

16          Francis 11kv feeder (Norton)

         1 Customer affected

Single phasing

Fault occurred on 14/06/13 at 14:48hrs

Estimated Restoration Time: 17.06.13

17          Clearwater 11kv feeder (Norton)

         50Customer affected

No power

Fault occurred on 16/06/13 at 13:10hrs

Estimated Restoration Time: 17.06.13

18          Majestic 11kv feeder (Norton)

         2 Customer affected

Dropped link

Fault occurred on 14/06/13 at 07:54hrs

Estimated Restoration Time: 13:40hrs – 15.06.13

19          Town 2 LT (Chegutu)

         1 Customer affected

Burnt weatherdac – C372

Fault occurred on 14/06/13 at 11:20hrs

Estimated Restoration Time: 18.06.13

20          Town 2 LT (Chegutu)

         1 Customer affected

No power – P827

Fault occurred on 14/06/13 at 15:28hrs

Estimated Restoration Time: 18.06.13

21          Railway 11kv feeder (Chegutu)

         20 Customer affected

Tripped AR

Fault occurred on 15/06/13 at 07:43hrs

Estimated Restoration Time: 16:00hrs

 

 

 

22          Majestic 11kv feeder (Chegutu)

         600 Customer affected

Broken conductor

Fault occurred on 15/06/13 at 09:27hrs

Estimated Restoration Time: 17.40hrs

23          Water LT (Chegutu)

         1 Customer affected

Tripped MCB -50026

Fault occurred on 15/06/13 at 10:00hrs

Estimated Restoration Time: 18.06.13

24          Kasama 11kv feeder (Chegutu)

         1 Customer affected

Touching conductors

Fault occurred on 15/06/13 at 19:42hrs

Estimated Restoration Time: 17.06.13

25        Railway 11kv feeder (Chegutu)

         60 Customer affected

No power

Fault occurred on 15/06/13 at 08:37hrs

Estimated Restoration Time: 17.06.13

26          Gadzema 11kv feeder (Chegutu)

         4000 Customer affected

Tripped CB

Fault occurred on 16/06/13 at

Estimated Restoration Time: 12:57hrs

27          Gadzema 33kv feeder (Chegutu)

         4000 Customer affected

Tripped CB

Fault occurred on 16/06/13 at

Estimated Restoration Time: 12:57hrs

28          Chegutu East 33kv feeder (Chegutu)

         600 Customer affected

Questionare

Do you have energy saver bulbs in your house?

Yes - 76.9%
NO - 23.1%
What is an energy saver bulb? - 0%
18-12-2012
Prepaid Meters (FAQ)
Prepaid Meters (FAQ)

The Ministry of Energy and Power Development has successfully launched the prepaid metering technology that is replacing the conventional billing system that had been posing challenges to the Zimbabwe Electricity Transmission and Distribution Company (ZETDC), a subsidiary of ZESA Holdings. ZETDC has already installed 19 000 prepaid meters countrywide, with a further 19 000 expected to be installed by end...

Read more
12-12-2012
Why do we have load shedding?
Why do we have load shedding?

Since 2007, the country experienced load shedding as a result of the shortage of capacity in the country. What exactly is load shedding? Load shedding simply stated is a controlled temporary way of cutting power to parts of the country when there is not enough electricity to meet the needs of customers. This is as a result of a shortage of...

Read more
12-12-2012
Why am I asked to save power at the worst possible time?
Why am I asked to save power at the worst possible time?

The idea and principle behind the conserving of energy is that it is better to INFORM the public about the state of the network and ASK them to do something to help, than it is for everyone to experience rolling load shedding of long periods. When you stop to think about it, it is logical that power usage peaks between 5...

Read more
12-12-2012
You really make an impact
You really make an impact

If you are wondering if you really make an impact - consider this. Nothing connects all of us together like the electricity network. Electricity cannot be effectively stored in large quantities. This means that when you turn on a light, that power needs to be generated immediately by a generator somewhere on the network. If there is not enough generation available,...

Read more
12-12-2012
Safe use of electricity in the home.
Safe use of electricity in the home.

When originally installed a wiring system is suitably designed for its intended purpose and each circuit is safeguarded against the effects of overload, short-circuits and fault currents by protective devices of the correct current rating and breaking capacity.  In this regard, the wiring regulations are explicit that every circuit shall be so designed that a small overload of long duration...

Read more

Comparative Average Tariffs

  • Global Tariffs
Click here
  • Regional Tariffs

US14c kWh

  • Zimbabwe Tarriffs

US9.83c kWh

Contact Details

+263 4 773302/04-10,
+263 4 773314/16/18/19/24/28-31/34,
+263 4 774491/96/98-9

Fax:+263 4 774542/3
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Address:     Electricity Centre
                       25 Samora Machel Ave
                       Harare

ZESA HOLDINGS Private Limited © 2013

Developed By Total IT Solutions Zimbabwe

Close

Load Shedding Status

    Minimal
    Light
    Moderate
    Heavy
    Severe

Power Generation Stats

Gen Station
18 June 13
Energy
(Megawatts)
Hwange 578 MW
Kariba 750 MW
Harare   15 MW
Munyati   35 MW
Bulawayo    23 MW
Imports   180 MW
Total 1581 MW
Close

Major Power Faults

 

ZIMBABWE ELECTRICITY TRANSMISSION AND DISTRIBUTION COMPANY (ZETDC) PVT LTD

 

DAILY FAULT REPORT

 

 

 

17 JUNE 2013

 

Harare Region

 

  1. 1.Mabelreign –CB 29 Birches (s/s 1864 - Avonlea Drive)

 

+100 customers affected in Avonlea

 

            Fault occurred on 12 June 2013

 

            Substation completely burnt (s/s1864). Substation to be reconstructed

 

            Estimated Restoration Time: 21/06/13 1630hrs

 

** Please note that most of the affected customers on back feed except a few

 

Action:                        Network Manager North

 

  1. 2.CB 119 Willowvale

 

            Nature of fault: Cable Fault between S/S 1341 & S/S 1594

 

            Fault occurred on 13/06/13

 

            Number of customers affected: Customers on backfeed

 

            Estimated Restoration Time: 17/06/13 1600hrs

 

Action:                 Network Manager South

 

 

 

3.         S/S 2090 Ardbennie

 

            Nature of fault: 200kVA Tx

 

            Fault occurred on 14/06/13

 

            Number of customers affected: 100

 

            Estimated Restoration Time: 17/06/13 1600hrs

 

Action:                 Network Manager South

 

 

 

4.         CB 19 Willowvale

 

            Nature of fault: Low voltage

 

            Fault occurred on 17/06/13

 

            Number of customers affected: 500

 

            Estimated Restoration Time: 17/06/13 1600hrs

 

Action:                 Network Manager South

 

 

 

5.         CB 139 Willowvale

 

            Nature of fault: Still sectionalising

 

            Fault occurred on 16/06/13

 

            Number of customers affected: 500

 

            Estimated Restoration Time: 17/06/13 1600hrs

 

Action:                 Network Manager South

 

 

 

6.         M70 T3

 

Nature of fault: 2 CTs leaking

 

Fault occurred on 16/06/13

 

Number of customers affected: +/-4000

 

Estimated Restoration Time: 17/06/13 1630hrs

 

            Action:                 Network Manager Chitungwiza

 

ZIMBABWE ELECTRICITY TRANSMISSION AND DISTRIBUTION COMPANY (ZETDC) PVT LTD

 

DAILY FAULT REPORT

 

 

 

17 June 2013

 

 

 

 

 

 

 

Southern Region

 

 

 

 

 

1.         G 23 S 2 – Thornhill Feeder, Gweru  

 

Nature of Fault: Line Fault, Substation Transformer fault (Oil drained)

 

Fault occurred: 17/06/13

 

Number of customers affected: 800

 

Expected date of restoration: 17/06/2013 1630hrs

 

Action:                        Network Manager (Gweru)

 

2.         S 20 S 103 – Mabika Feeder, Zvishavane  

 

Nature of Fault: Line Fault, Fault to be located

 

Fault occurred: 17/06/13

 

Number of customers affected: 100

 

Expected date of restoration: 17/06/2013 1630hrs

 

Action:                        Network Manager (Gweru)

 

DAILY FAULT REPORT

Northern Region

Monday 17 June 2013

  1. 1Chinhoyi North 33kV Feeder (Chinhoyi)
  2. 000 Customer affected

C/B tripped

Fault occurred on 14/06/13 at 08:40 hrs

Estimated Restoration Time: 10:10 hrs

 

  1. 2Chinhoyi 2 Feeder SS 35 (Chinhoyi)

20 Customers affected

C/B tripped

Fault occurred on 14/06/13 at 08:41 hrs

Estimated Restoration Time: 15:00 hrs

 

  1. 3Lions Den Feeder SS 137 (Chinhoyi)

40 Customer affected

Burnt LV feeder cable

Fault occurred on 14/06/13 at 09:02 hrs

Estimated Restoration Time: Pending

 

  1. 4Lions Den Feeder SS(Chinhoyi)

1 Customer affected

Power going on and off

Fault occurred on 14/06/13 at 11:23 hrs

Estimated Restoration Time: Pending

 

 

 

 

 

  1. 5Lions Den Feeder M10S177 (Chinhoyi)

2000 Customers affected

A/R tripped

Fault occurred on 14/06/13 at 14:14 hrs

Estimated Restoration Time: 19:30 hrs

 

  1. 6Chinhoyi 2 Feeder SS 37 (Chinhoyi)

40 Customers affected

C/B tripped

Fault occurred on 14/06/13 at 16:00 hrs

Estimated Restoration Time: 16:25 hrs

 

  1. 7Chinhoyi 2 Feeder SS 108(Chinhoyi)

20 Customers affected

Tree branch fell on LT line

Fault occurred on 14/06/13 at 17:32 hrs

Estimated Restoration Time: 18:30 hrs

8                Chinhoyi 2 Feeder SS 129 (Mhangura)

30 Customers affected

C/B tripped

Fault occurred on 14/06/13 at 17:51 hrs

Estimated Restoration Time: 19:00 hrs

9       Chinhoyi 2 Feeder SS 97 (Karoi)

20 Customers affected

C/B tripped

Fault occurred on 14/06/13 at 18:14 hrs

Estimated Restoration Time: 11:00 hrs on 15/06/13

10     11kV Two Tree Feeder M94c (Mhangura)

+-75 Customers affected

A/R tripped

Fault occurred on 14/06/13 at 14:05 hrs

Estimated Restoration Time: 18:30 hrs

11     K2g Feeder (Karoi)

+-150 Customers affected

Low voltage

Fault occurred on 14/06/13 at 03:00 hrs

Estimated Restoration Time: 19:00 hrs

 

12          K2aFeeder SS 8 (Kariba)

         +-50 Customers affected

Blown fuse

Fault occurred on 14/06/13 at 17:00 hrs

Estimated Restoration Time: 20:30 hrs

 

  1. 13der SS 28 (Chinhoyi)

1 Customer affected

Sparks on weather-dac

Fault occurred on 15/06/13 at 09:47 hrs

Estimated Restoration Time: Pending

 

  1. 14der M133S152 (Chinhoyi)

3000 Customers affected

A/R tripped

Fault occurred on 15/06/13 at 18:03 hrs

Estimated Restoration Time: 18:30 hrs

 

  1. 15

30 Customers affected

C/B tripped

Fault occurred on 15/06/13 at 18:25 hrs

Estimated Restoration Time: 20:30 hrs

16         K6a Feeder (Karoi)

+-350 Customers affected

Unknown

Fault occurred on 15/06/13 at 13:30 hrs

Estimated Restoration Time: 16:35 hrs

   17      K4b Feeder (Karoi)

+-180 Customers affected

Unknown

Fault occurred on 15/06/13 at 16:10 hrs

Estimated Restoration Time: 20:13 hrs

18     K6a Feeder SS 8 (Karoi)

         +-100 Customer affected

Unknown

Fault occurred on 15/06/13 at 07:30 hrs

Estimated Restoration Time: 14:55 hrs

 

  1. 19der SS 109 (Chinhoyi)

40 Customers affected

C/B tripped

Fault occurred on 16/06/13 at 11:25 hrs

Estimated Restoration Time: 12:30 hrs

 

  1. 20der SS 12 (Chinhoyi)

2 Customers affected

No power

Fault occurred on 16/06/13 at 11:26 hrs

Estimated Restoration Time: 16:30 hrs fault on customers side

 

  1. 21

100 Customers affected

A/R tripped

Fault occurred on 16/06/13 at 11:53 hrs

Estimated Restoration Time: 15:30 hrs

 

  1. 22

1000 Customers affected

No power

Fault occurred on 16/06/13 at 13:00 hrs

Estimated Restoration Time: Pending

 

  1. 23der M133S152 (Chinhoyi)

3000 Customers affected

A/R tripped

Fault occurred on 16/06/13 at 17:37 hrs

Estimated Restoration Time: 18:03 hrs

 

  1. 24der M12S139 (Chinhoyi)

2000 Customers affected

A/R tripped

Fault occurred on 16/06/13 at 18:17 hrs

Estimated Restoration Time: 19:03 hrs

 

  1. 25der SS 101 (Chinhoyi)

30 Customers affected

C/B tripped

Fault occurred on 16/06/13 at 18:36 hrs

Estimated Restoration Time: 19:00 hrs

 

 

  1. 26der M94c (Mhangura)

75 Customers affected

Burnt D-mounts

Fault occurred on 16/06/13 at 05:27 hrs

Estimated Restoration Time: 12:54 hrs

 

  1. 27der M94b (Mhangura)

+-70 Customers affected

Open link

Fault occurred on 16/06/13 at 07:04 hrs

Estimated Restoration Time: 16:32 hrs

10          Mutorashanga 11kV Feeder (Mutorashanga)

10 Customers affected

Power going on and off

Fault occurred on 16/06/13 at 09:30 hrs

Estimated Restoration Time: Pending

11            Birkdale Feeder (Mutorashanga)

2000 Customers affected

C/B tripped

Fault occurred on 16/06/13 at 13:05 hrs

Estimated Restoration Time: 13:25 hrs

12            Barwick Feeder (Mutorashanga)

         1 Customer affected

Single phasing at Jongwe Store

Fault occurred on 16/06/13 at 13:35 hrs

Estimated Restoration Time: Pending

13            M68b Feeder (Karoi)

+-60 Customers affected

Broken jumper

Fault occurred on 16/06/13 at 20:00 hrs

Estimated Restoration Time: 22:14 hrs

14          K2g Feeder (Karoi)

+-150 Customers affected

Low voltage

Fault occurred on 16/06/13 at 04:00 hrs

Estimated Restoration Time: 09:40 hrs

 

15          K2aFeeder (Mutorashanga)

         +-30 Customer affected

Branch on line

Fault occurred on 16/06/13 at 11:00 hrs

Estimated Restoration Time: 16:00 hrs

16          Francis 11kv feeder (Norton)

         1 Customer affected

Single phasing

Fault occurred on 14/06/13 at 14:48hrs

Estimated Restoration Time: 17.06.13

17          Clearwater 11kv feeder (Norton)

         50Customer affected

No power

Fault occurred on 16/06/13 at 13:10hrs

Estimated Restoration Time: 17.06.13

18          Majestic 11kv feeder (Norton)

         2 Customer affected

Dropped link

Fault occurred on 14/06/13 at 07:54hrs

Estimated Restoration Time: 13:40hrs – 15.06.13

19          Town 2 LT (Chegutu)

         1 Customer affected

Burnt weatherdac – C372

Fault occurred on 14/06/13 at 11:20hrs

Estimated Restoration Time: 18.06.13

20          Town 2 LT (Chegutu)

         1 Customer affected

No power – P827

Fault occurred on 14/06/13 at 15:28hrs

Estimated Restoration Time: 18.06.13

21          Railway 11kv feeder (Chegutu)

         20 Customer affected

Tripped AR

Fault occurred on 15/06/13 at 07:43hrs

Estimated Restoration Time: 16:00hrs

 

 

 

22          Majestic 11kv feeder (Chegutu)

         600 Customer affected

Broken conductor

Fault occurred on 15/06/13 at 09:27hrs

Estimated Restoration Time: 17.40hrs

23          Water LT (Chegutu)

         1 Customer affected

Tripped MCB -50026

Fault occurred on 15/06/13 at 10:00hrs

Estimated Restoration Time: 18.06.13

24          Kasama 11kv feeder (Chegutu)

         1 Customer affected

Touching conductors

Fault occurred on 15/06/13 at 19:42hrs

Estimated Restoration Time: 17.06.13

25        Railway 11kv feeder (Chegutu)

         60 Customer affected

No power

Fault occurred on 15/06/13 at 08:37hrs

Estimated Restoration Time: 17.06.13

26          Gadzema 11kv feeder (Chegutu)

         4000 Customer affected

Tripped CB

Fault occurred on 16/06/13 at

Estimated Restoration Time: 12:57hrs

27          Gadzema 33kv feeder (Chegutu)

         4000 Customer affected

Tripped CB

Fault occurred on 16/06/13 at

Estimated Restoration Time: 12:57hrs

28          Chegutu East 33kv feeder (Chegutu)

         600 Customer affected